Deadline for Climate Change  Agreement:
 Friday 7th November 2008.

 >>Click here for more information

 

home

latest news

DES News

archives

timetable

downloads

register

summary of the Levy

further information

q & a

links

board of directors

contact DES

DES News - Archives

Issue 5 - July 2005

Click here to downlad as a pdf (33.5 KB)


Dairy Energy Savings - CCA Fifth Year (01/10/04 - 30/09/05) Data Collection Spreadsheet
posted 24th October 2005

The Climate Change Agreement (CCA) fifth year period ends on the 30th of September, as you will know we are required to collate data from each site each year.

It is important to remember that the Department for Environment Food and Rural Affairs (Defra) will not judge your performance in this past year against your CCA targets. Defra only judge the performance of each two year milestone on one 12 month period with those two years.

Below are two attachments, a spreadsheet which is to be completed and submitted to Dairy Energy Savings Limited (DES) by, at the latest, Friday, 11th November. Also attached is a Word document providing guidance for completion of the spreadsheet.

For information, the next target period, MS3 (the 12 months performance that Defra judges against your target) starts on 1st October 2005.

The data collected from the last 12 months enables both the operator and the sector to take stock of the current performance against future targets. It is therefore, advisable to enter the milestone three target in the target box within the spreadsheet.

Data Collection Spreadsheet (Excel, 43KB)

Guidance for completing the spreadsheet (Word, 28KB


Second Target Period Sector Performance
posted 30th June 2005

Here is a summary of how the sector performed at the end of the second target period (1 October 2003 to 30 September 2004).

The sector had a target from its base year of a 5.65% reduction in kWh per tonne of production. The target to be achieved was set at 484.52kWh/mt. This target was set after all entrants and exits were taken into account since the end of the first target period.

The unadjusted performance of the sector was 458.36kWh/mt. This means that the sector more than met the target by an additional 5.40% beyond the original percentage reduction of 5.65%. Thus the sector is now 11.05% more efficient than at the base year.

The unadjusted carbon dioxide surplus for the sector was 50,483.73mt.

If the sector kWh/mt performance was kept unchanged, it would be meeting the revised fourth milestone target of 459.20kWh/mt (period of 1 October 2007 to 30 September 2008).

A more comprehensive report will be posted in the next few weeks.


Issue 4 - September 2004

Click here to download as a pdf (117.6 KB)


Managed by:

Link to wwww.dairyuk.org

Dairy Energy Savings
A company Limited by Guarantee and Registered in England No. 4062424

Registered Office:
93 Baker Street, London W1U 6QQ  tel: 0207 486 7244